Well today was a little warmer then yesterday and at least there was no breeze to chill the air. This is what we had when we started this morning.

After leveling out the floor we started to frame up walls using 2×3’s for nailers and 2×2’s for studs. By lunch time we had 3 walls framed and the little helpers had arrived from indoors fresh from watching their favorite builders Kevin O’Conner and crew from This Old House. Here’s a picture of our morning’s worth of work.


After lunch when the helpers all got cold and retreated back inside for an afternoon Huricanes game with mom. We finished the front door and went to Lowe’s for roof truss materials. So after 2 days we have 4 walls a doorway and a roof skeleton. Here’s what it looks like after 2 full days of work.

So next weeknd barring adverse weather we will put the roof panels on, tar paper and shingle it, cut the windows out and install them, hang the door and install the ramp.
The last edition of the playhouse post’s will include a materials list and tools used in the construction of this project as well as some detail pictures of how it all went together…